Solve show the equations and simplify
The waste hauling company profits are stated as the difference between revenue and costs. That is P(x) = R(x) - C(x), where x is the number of tons processed. Find the maximum profit and the number of tonnage which must be processed in order to yield the maximum profit for each of the following: a) R(x) = 5x; C(x) = 0.0001x2
