Quality Control : Control Limits and p-Charts
Not what you're looking for?
Hunter Nut Company produces cans of mixed nuts, advertised as containing no more than 20% peanuts. Hunter Nut Company wants to establish control limits for their process to ensure meeting this requirement. They have taken 30 samples of 144 cans of nuts from their production process at periodic intervals, inspected each can, and identified the proportion of cans that did not meet the peanut requirement, shown in the Worksheet problem 10. Compute the average proportion nonconforming and the upper and lower control limits for this process. Draw the p-chart and interpret the results.
See the attached files.
All Data may be found in the Excel workbook Statistical Quality Control Problems.xls. Data for each problem are found on a separate worksheet.
Purchase this Solution
Solution Summary
Upper and lower control limits are investigated and p-charts are drawn. The solution is detailed and well presented. The response was given a rating of "5/5" by the student who originally posted the question.
Purchase this Solution
Free BrainMass Quizzes
Know Your Linear Equations
Each question is a choice-summary multiple choice question that will present you with a linear equation and then make 4 statements about that equation. You must determine which of the 4 statements are true (if any) in regards to the equation.
Geometry - Real Life Application Problems
Understanding of how geometry applies to in real-world contexts
Solving quadratic inequalities
This quiz test you on how well you are familiar with solving quadratic inequalities.
Multiplying Complex Numbers
This is a short quiz to check your understanding of multiplication of complex numbers in rectangular form.
Probability Quiz
Some questions on probability