    A time standard was set at 0.20 hour per unit based on the 50th unit produced. If the task has a 90% learning curve what would be the expected time of the 100th, 200th and 400th unit?

    Please give answer and explain.

    © BrainMass Inc. brainmass.com October 9, 2019, 10:35 pm ad1c9bdddf