Explore BrainMass

Finding Positions of Objects

I am having a hard time with some work, can anyone help me?
1. A business makes two kinds of bikes, model A and model B.
Model A requires 2 hours of assembly time and model B requires 3 hours of
assembly time. The parts for model A cost $25 per bike; those for model B cost
$30 per bike. If company has a total of 34 hours of assembly time and $365
available per day or these two models, what is the maximum number of each
model that can be made in a day and use all of the available resources.

2. An object moving vertically is at the given heights at the specified times. Find the position equation below for the object.

s= 1/2at^2+v0t+s0
(a) At t = 1 second, s = 119 feet.

(b) At t = 2 seconds, s = 80 feet.

(c) At t = 3 seconds, s = 39 feet.