Finding Positions of Objects
Not what you're looking for?
I am having a hard time with some work, can anyone help me?
1. A business makes two kinds of bikes, model A and model B.
Model A requires 2 hours of assembly time and model B requires 3 hours of
assembly time. The parts for model A cost $25 per bike; those for model B cost
$30 per bike. If company has a total of 34 hours of assembly time and $365
available per day or these two models, what is the maximum number of each
model that can be made in a day and use all of the available resources.
2. An object moving vertically is at the given heights at the specified times. Find the position equation below for the object.
s= 1/2at^2+v0t+s0
(a) At t = 1 second, s = 119 feet.
(b) At t = 2 seconds, s = 80 feet.
(c) At t = 3 seconds, s = 39 feet.
Purchase this Solution
Solution Summary
The solution assists with finding positions of the given objects.
Purchase this Solution
Free BrainMass Quizzes
Solving quadratic inequalities
This quiz test you on how well you are familiar with solving quadratic inequalities.
Know Your Linear Equations
Each question is a choice-summary multiple choice question that will present you with a linear equation and then make 4 statements about that equation. You must determine which of the 4 statements are true (if any) in regards to the equation.
Multiplying Complex Numbers
This is a short quiz to check your understanding of multiplication of complex numbers in rectangular form.
Geometry - Real Life Application Problems
Understanding of how geometry applies to in real-world contexts
Probability Quiz
Some questions on probability