Share
Explore BrainMass

Tasks assigned to each phase of SDLC

A project contains Analysis, Definition, Design, Implementation, Maintenance, and Support phases. How do we determine what tasks are assigned to each phase?

Solution Preview

1. System requirements analysis
Specifying and documenting system requirements.
Evaluating requirements for traceability, consistency, testability, and feasibility.

2.System architectural design
Establishing and documenting top-level architecture.
Evaluating the architecture for traceability, consistency, appropriateness, and feasibility.

3. Software requirements analysis
Identifying and documenting software requirements.
Evaluating requirements for traceability, consistency, testability, and feasibility.
Conducting joint review(s) and baseline the requirements.

4. Software architectural design
Transforming requirements into architecture.
Documenting top-level design for interfaces and database.
Drafting preliminary user documentation and test requirements.
Evaluating architecture for traceability, consistency, appropriateness, and feasibility. ...

Solution Summary

A project contains Analysis, Definition, Design, Implementation, Maintenance, and Support phases. Tasks assigned to each phase are determined.

$2.19