5. You are in charge of a major new product development project for your company. Instead of presenting the details of your analysis, you aggregate all three elements of this product into a simple PERT network to present to senior management as shown below. You would like to introduce simulation as a project management tool for your company and you feel that this product has enough visibility to persuade senior management of its utility. Using Crystal Ball, develop a plot of project duration as a function of probability of completion (please cut and paste the spreadsheet along with the cumulative frequency view).

Where

A = Requirements gathering (uniformly distributed varying between 3 and 5 week)
B = Develop prototype and test market (normally distributed with a mean of 5 weeks and a standard deviation of 3)
C = Manufacture and distribute new product (uniformly distributed varying between 5 and 8 week)
D = Advertising, trade shows, market to distributors, etc. (fixed at 11 weeks)

6. As a new manager of manufacturing of specialty devices for Farr Pharmaceutical Devices, you need to improve turnaround time. You currently are operating one manufacturing line. You did a queuing analysis on the operation, but found the mathematical solution did not accurately model the real world system; therefore, you decide to manually simulate the operation. You analyzed last year's data and arrived at the following distribution of arrival intervals and service times:

Distribution of Arrival Intervals

Arrival Interval (days) Number of
Occurrences Probability P(x) Cumulative Probability Random Number Range
1.0 4
2.0 6
3.0 3
4.0 7

Manufacturing times are uniformly distributed and vary between 1 and 3 days.

= 1+2r

Use the table below to manually simulate (hint - do NOT round your numbers to integer values) the process of your specialty manufacturing operation.

Job # r1 Inter-arrival time Total Clock Time Start Manu Time Wait Time Queue Length After Entry r2 Manu Time Depart Clock Time in System
1 --- --- 0 0.00 0.00 0 0.93
2 0.06 0.72
3 0.47 0.83
4 0.3 0.35
5 0.97 0.17
6 0.96 0.82
7 0.22 0.63
8 0.16 0.68
9 0.52 0.95
10 0.98 0.07

Determine the average waiting time, average queue length, and average time in the system.

Purchase this Solution

Solution Summary

The expert examines Farr Pharmaceuticals average waiting time.

Solution Preview

6. As a new manager of manufacturing of specialty devices for Farr Pharmaceutical Devices, you need to improve turnaround time. You currently are operating one manufacturing line. You did a queuing analysis on the operation, but found the mathematical solution did not accurately model the real world system; therefore, you decide to manually simulate the operation. You analyzed last ...

Purchase this Solution


Free BrainMass Quizzes
Terms and Definitions for Statistics

This quiz covers basic terms and definitions of statistics.

Know Your Statistical Concepts

Each question is a choice-summary multiple choice question that presents you with a statistical concept and then 4 numbered statements. You must decide which (if any) of the numbered statements is/are true as they relate to the statistical concept.

Measures of Central Tendency

This quiz evaluates the students understanding of the measures of central tendency seen in statistics. This quiz is specifically designed to incorporate the measures of central tendency as they relate to psychological research.

Measures of Central Tendency

Tests knowledge of the three main measures of central tendency, including some simple calculation questions.