Steelco manufactures two types of steel at three different steel mills. During a given month, each steel mill has 200 hours of blast furnace time available. Because of the differences in the furnaces at each mill, the time and cost to produce a ton of steel differ for each mill, as listed in the file P04_62.xls. Each month Steelco must manufacture at least 500 tons of steel 1 and 600 tons of steel 2. Determine how Steelco can minimize the cost of manufacturing the desired steel.
I have been able to figure out previous questions, but this has a restriction where it has to produce ATLEAST 500 and 600 tons. When I do the constraints, I am not sure if these numbers would be the constraints, and also if I should put in a time frame of MONTH 1 etc.
Purchase this Solution
Solution Summary
This posting provides solution to linear programming problem for Steelco manufacturers for minimizing the total cost of manufacturing.
Purchase this Solution
Free BrainMass Quizzes
Graphs and Functions
This quiz helps you easily identify a function and test your understanding of ranges, domains , function inverses and transformations.
Probability Quiz
Some questions on probability
Know Your Linear Equations
Each question is a choice-summary multiple choice question that will present you with a linear equation and then make 4 statements about that equation. You must determine which of the 4 statements are true (if any) in regards to the equation.
Multiplying Complex Numbers
This is a short quiz to check your understanding of multiplication of complex numbers in rectangular form.
Geometry - Real Life Application Problems
Understanding of how geometry applies to in real-world contexts