Explore BrainMass
Share

Needs Assessment and Quality Improvement

This content was COPIED from BrainMass.com - View the original, and get the already-completed solution here!

Using the same process selected for your Needs Assessment Quality Improvement Paper, prepare a paper that includes a description of the improved process and a "To Be" flow chart. Determine what items need to be measured to substantiate the improved process, the data required to measure improvement, and the upper and lower control limits. Select the best total quality tool to ensure continuous monitoring so that the process is in control. Present your data using your selected total quality tool.

© BrainMass Inc. brainmass.com March 21, 2019, 12:11 pm ad1c9bdddf
https://brainmass.com/business/business-process-improvement-reengineering/needs-assessment-and-quality-improvement-61415

Solution Preview

Please see response attached for best formatting (also below) , as well as an example of a flow chart for consideration. I alos provided an outline to consider, if this is an essay assignment. I hope this helps and take care.

RESPONSE:

Hi,

Let's go through each sentence and determine what it is you are asked to do:

Please explain the following to me:

Using the same process selected for your Needs Assessment for Quality Improvement Paper (This is quite straightforward, you are instructed to use the same process that you used and had selected for your last paper, you will have to follow the same process. I AM ASSUMING that you have already completed this process, so refer back to your paper), prepare a paper that includes a description of the improved process (this is self-explanatory, as you will have to explain the improved process. In other words, you will have to go back to your last needs assessment paper and describe the needs that you identified and describe how you plan to meet these needs through specific steps that will improve the process e.g. illustrating with a to Be flow chart e.g. ...) and ...

Solution Summary

By example, this solution illustrates the improved process and a "To Be" flow chart. It also determines the items that need to be measured to substantiate the improved process, the data required to measure improvement, and the upper and lower control limits. It also selects the best total quality tool to ensure continuous monitoring so that the process is in control and presents the data using the selected total quality tool.

$2.19