Frank's Fabricators has collected the following information to develop a standard time for producing their high-volume Navigator III, a universal remote control. All of the times are in minutes.

Element (in Minutes)

Observations 1 2 3 4 5 6

Cycle 1 1.10 3.00 0.92 1.23 1.46 1.80
Cycle 2 1.08 0.88 1.30 1.64 1.78
Cycle 3 1.15 3.20 0.85 1.26 1.55 1.76
Cycle 4 1.16 0.88 1.33 1.52 1.80
Cycle 5 1.07 3.10 0.90 1.28 1.62 1.82
Cycle 6 1.10 0.94 1.30 1.60 1.82

Rating Factor
0.95 0.90 1.05 1.0 0.85 1.10
Frequency
1.0 0.50 1.0 1.0 1.0 1.0

Calculate the mean observed time for each element.

(Round your answers to 3 decimal places, the tolerance is +/-0.001.)

Element Mean observed time

1
2
3
4
5
6

You have twenty-five observations of university policeman Sgt. Jack B. Nimble during his normal workday. The results are shown here. Assume that the estimated proportion is to be within 5 percent of the true proportion 95 percent of the time.

Activity Observed Number of Times Observed

Doing paperwork 9
On the phone 3
Eating doughnuts 3
Cleaning weapon 4
Idle 2
Not in sight 4

Based on your preliminary observations, how many total observations do you need to estimate the proportion of time Sgt. Nimble spends doing paperwork?

How many total observations do you need to estimate the proportion of time Sgt. Nimble spends on the phone?

Purchase this Solution

Solution Summary

The solution describes the determination of mean observed time for elements and the determination of sample size needed to estimate the proportion.

Solution Preview

Please see the attachment for the solution in proper format.

Frank's Fabricators has collected the following information to develop a standard time for producing their high-volume Navigator III, a universal remote control. All of the times are in minutes.

Element (in Minutes)

Observations 1 2 3 4 5 6

Cycle 1 1.10 3.00 0.92 1.23 1.46 1.80
Cycle 2 1.08 0.88 1.30 1.64 1.78
Cycle 3 1.15 3.20 0.85 1.26 1.55 1.76
Cycle 4 1.16 0.88 1.33 1.52 1.80
Cycle 5 1.07 3.10 0.90 1.28 1.62 1.82
Cycle 6 1.10 0.94 1.30 1.60 1.82

Rating Factor
0.95 0.90 1.05 1.0 0.85 1.10
Frequency
1.0 0.50 1.0 1.0 1.0 1.0

Calculate the mean observed time for each element.

(Round your answers to 3 decimal places, the tolerance is ...

Purchase this Solution


Free BrainMass Quizzes
SWOT

This quiz will test your understanding of the SWOT analysis, including terms, concepts, uses, advantages, and process.

Organizational Leadership Quiz

This quiz prepares a person to do well when it comes to studying organizational leadership in their studies.

Writing Business Plans

This quiz will test your understanding of how to write good business plans, the usual components of a good plan, purposes, terms, and writing style tips.

Change and Resistance within Organizations

This quiz intended to help students understand change and resistance in organizations

Paradigms and Frameworks of Management Research

This quiz evaluates your understanding of the paradigm-based and epistimological frameworks of research. It is intended for advanced students.