A 415V to 11 kV transformer has a rating of 200 kVA. The winding resistance and leakage reactance when referred to the primary are 0.014 and 0.057 ohms respectively.

(a) Determine the % regulation of the transformer at 0.8 power factor lagging.

(b) In designing a particular 415V to 11 kV, 200 kVA transformer, the primary winding resistance is to be 10 m?. Find the maximum winding resistance of the secondary winding if the transformer is to have 2% regulation at unity power factor

© BrainMass Inc. brainmass.com October 25, 2018, 4:38 am ad1c9bdddf
https://brainmass.com/engineering/power-engineering/transformer-386891

Solution Summary

Step by step solution provided.

$2.19
See Also This Related BrainMass Solution

Case Study and Decision Tree: Should this company replace an existing PCB transformer?

Case Problem: Transformer Replacement at Mountain States Electric Service

Mountain States Electric Service is an electrical utility company serving several states in the Rocky Mountains region. It is considering replacing some of its equipment at a generating substation and is attempting to decide whether it should replace an older, existing PCB transformer. (PCB is a toxic chemical known formally as polychlorinated biphenyl.) Even though the PCB generator meets all current regulations, if an incident occurred, such as a fire, and PCB contaminated caused harm either to neighboring businesses or farms or to the environment, the company would be liable for damages. Recent court cases have shown that simply meeting utility of liability if an incident causes harm to others. Also, courts have been awarding large damages to individuals and businesses harmed by hazardous incidents.

If the utility replaces the PCB transformer, no PCB incidents will occur, and the only cost will be the cost of the transformer, $85,000. Alternatively, if the company decides to keep the existing PCB transformer, then management estimates that there is a 50-50 chance of there being a high likelihood of an incident or a low likelihood of an incident. For the case in which there is a high likelihood than an incident will occur, there is a .004 probability that a fire will occur sometime during the remaining life of the transformer and a .996 probability that no fire will occur. If a fire occurs, there is a .20 probability that it will be bad and the utility will incur a very high cost of approximately $90 million for the cleanup, whereas there is an .80 probability that the fire will be minor and cleanup can be accomplished at a low cost of approximately $8 million. If no fire occurs, no cleanup costs will occur. For the case in which there is a low likelihood of an incident occurring, there is a .001 probability that a fire will occur during the life of the existing transformer and a .999 probability that a fire will not occur. If a fire does occur, the same probabilities exist for the incidence of high and low cleanup costs, as well as the same cleanup costs, as indicated for the previous case. Similarly, if no fire occurs, there is no cleanup cost.

* Perform a decision tree analysis of this problem for mountain state electric service and indicate the recommended solution.
* Is this the decision you believe the company should make?
* Explain your reasoning.