    A PERT problem

    This content was COPIED from BrainMass.com - View the original, and get the already-completed solution here!

    The Denver Iron and Steel Company is expanding it operations to include a new drive-in weight station. The weight station will be a heated/air conditioned building with a large floor and small office. The large room will have the scales, a 15-foot counter, and several display cases for it equipment. Before erection of the building, the project manager evaluated the project using PDM/CPM analysis. The activities with their correspondence times were recorded in table A. Using PDM/CPM analysis, find the critical path, the slack times and the expected completion time.

    © BrainMass Inc. brainmass.com June 3, 2020, 7:14 pm ad1c9bdddf
    https://brainmass.com/business/buildings/pert-problem-91247

    Attachments

    Solution Summary

    This posting contains a PERT problem which involves finding critical path, calculating slack and expected completion time for the project.