Process control

This content was STOLEN from BrainMass.com - View the original, and get the solution, here!

You have taken data from a production process in order to develop an Xbar control chart. You have 25 samples of data with 5 parts measured in each sample to get the Xbar and R (Range). Use this data shown in the table.

Sample 1 2 3 4 5 Xbar R
1 1.55 1.58 1.64 1.67 1.50 1.588 0.17
2 1.52 1.62 1.71 1.74 1.60
3 1.47 1.57 1.44 1.56 1.42
4 1.67 1.73 1.76 1.64 1.64
5 1.46 1.52 1.60 1.41 1.43
6 1.44 1.50 1.53 1.37 1.41
7 1.55 1.64 1.70 1.53 1.58
8 1.54 1.72 1.66 1.52 1.57
9 1.48 1.60 1.57 1.46 1.51
10 1.43 1.55 1.52 1.43 1.46
11 1.40 1.52 1.56 1.38 1.43
12 1.60 1.44 1.55 1.58 1.49
13 1.48 1.46 1.57 1.60 1.65
14 1.56 1.54 1.65 1.68 1.59
15 1.42 1.39 1.51 1.54 1.45
16 1.70 1.71 1.61 1.73 1.64
17 1.51 1.35 1.37 1.49 1.40
18 1.41 1.32 1.44 1.32 1.35
19 1.69 1.58 1.75 1.60 1.63
20 1.67 1.56 1.79 1.58 1.61
21 1.65 1.57 1.68 1.56 1.59
22 1.52 1.46 1.55 1.45 1.46
23 1.51 1.41 1.54 1.42 1.45
24 1.62 1.51 1.69 1.53 1.56
25 1.57 1.46 1.60 1.47 1.51

First plot the data using Excel.
Then determine the UCL and LCL. Do any of the data points need to be thrown out? If so, then recalculate the UCL and LCL.
Then you begin to plot results on this chart. Here are the next 6 samples of data (sample size = 5).
Sample # 1 2 3 4 5 Xbar
26 1.51 1.35 1.37 1.49 1.40
27 1.41 1.32 1.44 1.32 1.35
28 1.69 1.58 1.72 1.60 1.63
29 1.67 1.56 1.70 1.58 1.61
30 1.65 1.57 1.68 1.56 1.59
31 1.52 1.46 1.55 1.45 1.46
Plot these on the control chart.

Is the process in control?
Provide a one page paper discussing the problem, what you did to solve it and what your specific recommendation or plan is for monitoring quality.