Explore BrainMass

Explore BrainMass

    Western Electric runs rule

    This content was COPIED from BrainMass.com - View the original, and get the already-completed solution here!

    See attached for data.

    1. A Lean Six Sigma black belt project results in a lower defective rate at the final inspection of a plastic molded component. Thirty days of data presented in the following table.

    (a) Create the appropriate control chart for the improved process. Apply only Western Electric runs rule 1 for determining non-random patterns. Assume any p estimate that violates Western Electric runs rule 1 has an assignable cause, omit it from the next control limit estimate, and repeat this process plotting a control chart until all p estimates are in control.

    (b) Based on the characteristics of the Phase 1 control chart, discuss the design of a control chart for Phase 2 future production.

    © BrainMass Inc. brainmass.com June 4, 2020, 3:38 am ad1c9bdddf
    https://brainmass.com/statistics/sampling/western-electric-runs-rule-525690

    Attachments

    Solution Preview

    Please see the 2 p charts in the mintab file

    1. A Lean Six Sigma black belt project results in a lower defective rate at the final inspection of a plastic molded component. Thirty days of data presented in the following table.
    a) Create the appropriate control chart for the improved process. Apply only Western Electric runs ...

    Solution Summary

    The expert examines Western Electric runs rule. An appropriate control charts for the improved process is determined.

    $2.19

    ADVERTISEMENT