    Finite Math Word Problems

    This content was COPIED from BrainMass.com - View the original, and get the already-completed solution here!

    To pour a concrete sidewalk takes 2 hours of preparation and 3 hours of finishing. To pour a concrete patio takes 4 hours of preparation and 3 hours of finishing. ABC Concrete Company makes a profit of $450 on a sidewalks and $700 on a patio. How many sidewalks and patios should the company construct to maximize its profit? Set up a system of inequalities for this problem, identify all variables used, and give the objective function, but do not solve.

    © BrainMass Inc. brainmass.com October 10, 2019, 1:01 am ad1c9bdddf
    https://brainmass.com/math/discrete-math/finite-math-word-problems-317368

    Solution Preview

    Let x = Number of sidewalks to be made and y = Number of patios ...

    Solution Summary

    The solution discusses maximization of a poor concrete sidewalk. the maximization problem is set up by a system of inequalities. All variables are identified and the object function is given.