To pour a concrete sidewalk takes 2 hours of preparation and 3 hours of finishing. To pour a concrete patio takes 4 hours of preparation and 3 hours of finishing. ABC Concrete Company makes a profit of $450 on a sidewalks and $700 on a patio. How many sidewalks and patios should the company construct to maximize its profit? Set up a system of inequalities for this problem, identify all variables used, and give the objective function, but do not solve.
© BrainMass Inc. brainmass.com December 24, 2021, 8:49 pm ad1c9bdddfhttps://brainmass.com/math/discrete-math/finite-math-word-problems-317368
Solution Preview
Let x = Number of sidewalks to be made and y = Number of patios ...
Solution Summary
The solution discusses maximization of a poor concrete sidewalk. the maximization problem is set up by a system of inequalities. All variables are identified and the object function is given.