    A manufacturing company produces rods. Each rod is required to be 20 millimeters in diameter. Each hour, random samples of size n = 4 rods are measured to check process control. Five hours of observations yielded the following:

    Diameter
    Time Rod 1 Rod 2 Rod 3 Rod 4
    9 A.M. 19.8 20.4 19.9 20.3
    10 A.M. 20.1 20.2 19.9 19.8
    11 A.M. 19.9 20.5 20.3 20.1
    Noon 19.7 19.8 20.3 20.2
    1 P.M. 19.7 20.1 19.9 19.9

    Using these data and the table below, construct limits for xbar- and R-charts. Is the process in control?

    Control Chart Limits Factors
    Sample Size
    n Mean Factor(A2) Upper Range(D4) Lower Range (D5)
    2 1.880 3.628 0
    3 1.023 2.574 0
    4 0.729 2.282 0
    5 0.577 2.114 0
    6 0.483 2.004 0
    7 0.419 1.924 0.076
    8 0.373 1.864 0.136
    9 0.337 1.816 0.184
    10 0.308 1.777 0.223
    12 0.266 1.716 0.284

    Part 2:

    A p-chart has been developed for a particular item. In the past, 3% of such items have been found to be defective. If a sample of 100 is taken, and 9 of these are found to be defective, should the process be considered out of control? Explain.

    © BrainMass Inc. brainmass.com October 10, 2019, 1:25 am ad1c9bdddf
    https://brainmass.com/math/computing-values-of-functions/xbar-and-r-charts-is-the-process-in-control-333836

    Solution Summary

    Limits of xbar and Rcharts constructed. Also process control explained.

    $2.19