Explore BrainMass

Master Production Schedule

Assume a lot size of 10 for type A and 5 for type B single twist making, 15 for type A and 20 for type B double twist chain making, 20 for 2 inch piece fabrication and 40 for 5 inch piece fabrication.

(See attached file for full problem description)


Solution Preview

Demand for the 2 inch piece and 5 inch piece of steel rod is calculated by adding total demand for Type A and Type B of single twist chain and double twist chain ...

Solution Summary

Master Production Schedule using lot for lot rule for fabrication of Single twist chain and Double twist chain from Steel rod.