    Manchester Foundry produced 45,000 tons of steel in March at a cost of £1,150,000. In April, the
    foundry produced 35,000 tons at a cost of £950,000. Using only these two data points, determine the
    cost function for Manchester.
    What is the slope?

    © BrainMass Inc. brainmass.com June 3, 2020, 11:04 pm ad1c9bdddf
    https://brainmass.com/business/finance/the-solution-to-high-low-method-261447

    Solution Preview

    We have these data points:

    35,000 tons costs £950,000
    45,000 tons costs £1,150,000

    Notice the difference between the high of 45,000 tons produced and 35,000 tons produced is (45,000 tons - 35,000 tons) = 10,000 tons with a matching change in costs of (£1,150,000 - £950,000) = £200,000.
    We can calculate the variable cost per ton at £20 per unit (£200,000 / ...