Please help with this question.

In Master Production Schedule Stability time fencing is shown as an extension of the freeze concept. In the manufacture of bicycles, describe this concept.

Please provide references.

Solution Preview

In the manufacturer of bicycles time fixing would serve to provide effective guidelines that adequately describe the where within the bicycle manufacturing process there will be adaptations and or changes to the overall manufacturing process. These changes will occur based upon the need for there to be differing manufacturing processes and procedures based on the fact that bicycles will go through different stages of manufacturing in the overall production process. The first time fencing boundary would be the planning time fence, which would be the time fencing in which operational planning procedures ...