Purchase Solution

Manufacturing processes

Not what you're looking for?

Ask Custom Question

The Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 40, 35, and 15 cents per piece respectively. Parts A and B are assembled first on assembly line 1, which produces 140 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are in total six drilling machines, but at present only 3 of them are operational. Each drilling machine drills part C at a rate of 50 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 160 components per hour. At present, components are produced eight hours a day and five days a week.

Costs:

The cost of assembly labor is 30 cents per part of each assembly line; the cost of drilling labor is 15 cents per part. For drilling, the cost of electricity is 1 cent per part. The total overhead cost has been calculated as $1,200 per week. The depreciation cost for equipment has been calculated as $30 per week.

Questions:

1) Suppose a second shift of eight hours is run for assembly line 1 and the same is done for the final assembly line. In addition, four of the six drilling machines are made operational. The drilling machines, however, operate for just eight hours per day. What is the cost per unit output? (everything should be in per week)

2) Management decides to run a second shift of eight hours for assembly line 1 plus a second shift of only four hours for the final assembly line. Five of the six drilling machines operate for eight hours per day. What is the cost per unit output?

Purchase this Solution

Solution Summary

Excel file contains calculations of cost per unit under two manufacturing processes.

Purchase this Solution


Free BrainMass Quizzes
Basics of corporate finance

These questions will test you on your knowledge of finance.

IPOs

This Quiz is compiled of questions that pertain to IPOs (Initial Public Offerings)

Six Sigma for Process Improvement

A high level understanding of Six Sigma and what it is all about. This just gives you a glimpse of Six Sigma which entails more in-depth knowledge of processes and techniques.

Employee Orientation

Test your knowledge of employee orientation with this fun and informative quiz. This quiz is meant for beginner and advanced students as well as professionals already working in the HR field.

Cost Concepts: Analyzing Costs in Managerial Accounting

This quiz gives students the opportunity to assess their knowledge of cost concepts used in managerial accounting such as opportunity costs, marginal costs, relevant costs and the benefits and relationships that derive from them.