Explore BrainMass

Explore BrainMass

    Solver Linear Programming Model in Standard Form

    This content was COPIED from BrainMass.com - View the original, and get the already-completed solution here!

    Irwin Textile Mills produces two types of cotton cloth - denim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such, requires 7.5 pounds of raw cotton per yard, whereas denim requires 5 pounds of raw cotton per yard. A yard of corduroy requires 3.2 hours of processing time; a yard of denim requires 3.0 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroy is 510 yards per month. The manufacturer has 6,500 pounds of cotton and 3,000 hours of processing time available each month. The manufacturer makes a profit of $2.25 per yard of denim and $3.10 per yard of corduroy. The manufacturer wants to know how many yards of each type of cloth to produce to maximize profit.

    a. Formulate a linear programming model for this problem.
    B. Transform this model into standard form.

    © BrainMass Inc. brainmass.com June 3, 2020, 7:53 pm ad1c9bdddf
    https://brainmass.com/statistics/quantative-analysis-of-data/solver-linear-programming-model-in-standard-form-115709

    Solution Preview

    Suppose x yards of denim and y yards of corduroy are produced. ...

    Solution Summary

    Excel attachment shows how to find a linear programming model for a textile mill and then turn it into standard form.

    $2.19

    ADVERTISEMENT