Purchase Solution

Random Variables Problem Set

Not what you're looking for?

Ask Custom Question

Please provide step by step solution with all work shown for the attached problem sets. It is important to see the steps required to solve the problems so I can understand the process for future problems: (see attachment)
1. A die is loaded so that the probability of any side showing is proportional to the number on that side. If the die
is rolled and you win 1 for every dot showing, what is the probability distribution for X, the number of dollars
won? What is the probability X is less than 4?

2. Parts that are connected in a system do not fail independently of one another. In particular, two interconnected
parts, A and B, fail in the following pattern. On any given day there is a 20% chance that B will fail, while if A
fails, there is a .7 probability that B will fail on the same day. The probability that both parts fail on the same
day is .07. On any given day, what is the most likely number of parts to fail?

3. In a particular FMS (flexible manufacturing system) setup, it can take either 1, 2, 3, or 4 hours to change over
a production line. If a changeover takes at least 3 hours, there is a 90% probability that it will take 4 hours. If
a changeover takes at least 2 hours, there is a .5 probability that it will take at least 3 hours. The probability
that a changeover is completed in 1 hour is .20. Let X be the number of hours required for a changeover.
What is the probability distribution for X?

4. A continuous distribution with a constant density is called uniform (see Section 5.5. of MBB textbook). For
instance, suppose that the daily high temperature in Durham in July is uniformly distributed between 87.5
degrees and 102.5 degrees. Then the probability density function for the daily high temperature X is given by
f(x) = 1/15; 87.5 ≤ x ≤ 102.5, and f(x) = 0 elsewhere. Draw this probability density function and verify that the
area under the curve defined by the density function equals one. What is the probability that the daily high
temperature on July 7 is greater than 100? What is the probability that the daily high temperature on July 7 is
greater than or equal to 100?

5. An oil wildcatter owns drilling rights at two widely separated locations. After consulting a geologist, he feels
that at each location the odds against discovering oil if a well is drilled are 9-to-1. A well costs 100,000 to
drill, and this is a total loss if no oil is found. On the other hand, if oil is discovered, rights to the oil can be
sold for $1,600,000. The wildcatter has 100,000 available for drilling expenses. Find the mean and standard
deviation of the wildcatter's profit
(a) if the 100,000 is used to drill a single well,
(b) if the wildcatter finds a partner to share costs and profits equally (each will receive 1/2 of the final
profit, positive or negative) and their pooled funds are used to drill wells in two different locations.
(Hint: Work with profits in units of 100,000 to simplify calculations.)

6. A company manufactures wooden furniture. The pieces of wood for a piece of furniture are joined by wooden
dowels rather than by any metal fasteners, and the process is not too fast. Once the necessary pieces of wood for a table are cut, two tasks remain: the table is assembled, then it is stained. Let A represent the amount of time
(in working days) it takes to assemble a table, and suppose that the distribution of A can be represented by the
continuous probability density function f(a) = 0.5 for 1 ≤ a ≤ 3 (and 0 elsewhere). The time (in working days)
required to stain a table is denoted by S, and like A, it is uncertain, because the staining department may be too
busy to handle a table as soon as it is received. The distribution of S can be represented by the discrete
probability distribution: P(s) = (6-s)/10 for s = 2, 3, 4, 5 (and 0 elsewhere). Note that the assembly time can take
any weird number of days (e.g., 1.57 days) whereas staining takes exactly 2,3,4, or 5 days.
(a) Find the probability that the assembly time for a table is more than 2 but less than 4 working days.
(b) Find the probability that the staining time is less than 3.5 days.
(c) Find the expected total time for the table to be both assembled and stained.
(d) What is the probability that the total time for assembly and staining is more than 4.5 working days?

Attachments
Purchase this Solution

Solution Summary

This solution contains step-by-step calculations supplied with explanations to answer the random variables problem set. A diagram is included for further understanding.

Solution Preview

Hello!
Here are your answers.

Question 1
First we must find the distribution of the random variable. We know that the probability of showing each side is proportional to the value of that side. Therefore:

Prob(showing 1) = 1/(1+2+3+4+5+6) = 1/21
Prob(showing 2) = 2/(1+2+3+4+5+6) = 2/21
Prob(showing 3) = 3/21
Prob(showing 4) = 4/21
Prob(showing 5) = 5/21
Prob(showing 6) = 6/21

It can be asily seen that these probabilities add up to 1.

Clearly, the probability that X is less than 4 is:
Prob(showing 1) + Prob(showing 2) + Prob(showing 3) = 1/21 + 2/21 + 3/21 = 6/21

Question 2
We already know that the probability that 2 parts fails (A and B fail) is 0.07. Now let's find the probability that either A or B (but not both) fail; that is, the probability that 1 part fails. In order to find it, we first need to find the probability that A fails. We can calcukate it with the following information:

P(B fails | A fails) = P(B fails AND A fails)/P(A fails)

But we know that P(B fails | A fails) = 0.7 and P(B fails AND A fails) = 0.07. Therefore,

0.7 = 0.07/P(A fails)

P(A fails) = 0.07/0.7 = 0.1

Now, we can find the probability that either A or B or both fails using the usual formula:

P(A fails or B fails) = P(A fails) + P(B fails) - P(A fails AND B fails) = 0.1 + 0.2 - 0.07 = 0.23

Now, subtracting from that the probability that both fail, we get the probability that either A or B but not both fails. So this probability is 0.23 - 0.07 = 0.16. We conclude that the probability that 1 part fails is 0.16. Since the probability that 2 parts fail was 0.07, and all the probabilities must add up to 1, then it's clear that the probability that zero parts fail is 1 - 0.16 - 0.07 = 0.77. The most likely number of parts to fail is zero.

Question 3
Just as in 2, we use the given information in order to find the probabilities of each number of hours.

We know that:

P(3 or 4 | 2 or 3 or 4) = 0.5
[about notation: we're told that given that it takes at least 2 hours -that is, "2 or 3 or 4" hours- there is a 0.5 chance that it will take at least 3 hours -that is, "3 or 4" hours. That's what ...

Purchase this Solution


Free BrainMass Quizzes
Measures of Central Tendency

This quiz evaluates the students understanding of the measures of central tendency seen in statistics. This quiz is specifically designed to incorporate the measures of central tendency as they relate to psychological research.

Terms and Definitions for Statistics

This quiz covers basic terms and definitions of statistics.

Measures of Central Tendency

Tests knowledge of the three main measures of central tendency, including some simple calculation questions.

Know Your Statistical Concepts

Each question is a choice-summary multiple choice question that presents you with a statistical concept and then 4 numbered statements. You must decide which (if any) of the numbered statements is/are true as they relate to the statistical concept.