Four different paints are advertised as having the same drying time. To check the manufacturer's claims, five samples were tested for each of the paints. The time in minutes until the paint was dry enough for a second coat to be applied was recorded. The following data were obtained.

Paint 1 Paint 2 Paint 3 Paint 4
128 144 133 150
137 133 143 142
135 142 137 135
124 146 136 140
141 130 131 153
At the .05 level of significance, test to see whether the mean drying time is the same for each type of paint.

© BrainMass Inc. brainmass.com October 17, 2018, 4:32 am ad1c9bdddf
https://brainmass.com/statistics/analysis-of-variance/one-factor-analysis-of-variance-467119

Solution Preview

Please see the attachment for solution.

Procedure to do the analysis in Excel

Step 1: Open the Excel file and enter the data (see the ...

Solution Summary

The solution illustrates one factor analysis of variance using Excel Data Analysis Add-In.

$2.19
Similar Posting

Conduct a Factor Analysis on the 13 employee survey variables

Conduct a Factor Analysis on the 13 employee survey variables in the EMPLOYEE.sav file. Create the most optimal number of factors and name the factors as you deem appropriate, indicating which variables are associated with each factor. Discuss all output.

View Full Posting Details