Explore BrainMass

Explore BrainMass

    Compute the gains

    This content was COPIED from BrainMass.com - View the original, and get the already-completed solution here!

    Please see the attached file for the full problem description.

    A plant has a transfer function

    It is desired to use a negative unity feedback with a PID controller and a prefilter. The goal is to achieve a peak time of .75 second with ITAE-type performance. Compute the gains required to meet the design specification, , , .

    © BrainMass Inc. brainmass.com March 4, 2021, 5:52 pm ad1c9bdddf
    https://brainmass.com/engineering/mechanical-engineering/compute-gains-function-15628

    Attachments

    Solution Preview

    Please see the attached file.

    Well, we have:

    and we want to use this controller:

    In that case the closed loop transfer function (before applying the prefilter) would be:

    Ok, we want two things:
    The peak time and the ITAE ...

    Solution Summary

    This solution is provided in 163 words in an attached .doc file. It uses a closed loop transfer function to find the answer to the problem step-by-step.

    $2.49

    ADVERTISEMENT