AppleBerry MP3 Player: Make vs. Buy

AppleBerry (AB) is a high-tech manufacturer of digital products. Recently, it has been very successful at manufacturing a portable MP3 player, the Curvy. The Curvy comes in two forms: one with 32 GB of storage and one with 64 GB of storage. In doing production planning for the upcoming year, AB wants to determine how many of each type of Curvy to manufacture each month. Monthly demand for the Curvy is estimated to be 20,000 units for the 32 GB and 10,000 units for the 64 GB. AB has a limited number of manufacturing hours available to make these two products, with the hours being divided between fabrication, assembly, and shipping, as follows:

Department Monthly Labor Hours Available Hours/Unit 32 GB Curvy Hours/Unit 64 GB Curvy
Fabrication 12,000 1.5 1.75
Assembly 10,000 1.0 1.0
Shipping 6,000 1.0 1.0

Besides its own manufacturing facility, AB can contract out the manufacture to a subcontractor, who can supply up to 20,000 units per month total. This subcontractor will charge $115 for the 32 GB unit and $175 for the 64 GB unit, and it will ship directly to the distribution center. It costs AB $75 to make the 32GB unit and $125 to make the 64GB unit, if they build it themselves. AB plans on selling the 32 GB unit for $150 and the 64 GB unit for $250. Using its existing capacities, AB wants to determine how many of each model it should build itself and how many of each model it should order from the subcontractor in order to optimize profits. AB then wants to analyze the results to determine the best place to add additional capacity.

1. Create the spreadsheet model for this case and use Solver to optimize. Include an Answer Report and a Sensitivity Report.
2. Summarize what you found in two to three pages, answering the following questions:
a. What is the optimal profit?
b. What is the optimal product mix?
c. What are the binding constraints?
d. Should AB increase the labor hours made available for fabrication, assembly, or shipping? For each, explain why or why not.
e. If AB were to make 5 more hours of shipping labor available, how much will its profit go up? Base your answer on the Sensitivity Report and explain.
f. If AB were to make 5 more hours of assembly available, how much will its profit go up? Base your answers on the Sensitivity Report and explain.
g. The subcontractor has agreed to provide more capacity to AB to make more MP3 players, but it will charge an additional $40/unit to do so. Should AB agree? Why or why not? Base your answer on the Sensitivity Report and explain.

Purchase this Solution

Solution Summary

The problem set deals with quantitative analysis: Linear programming.

Solution Preview

AppleBerry MP3 Player: Make vs. Buy

AppleBerry (AB) is a high-tech manufacturer of digital products. Recently, it has been very successful at manufacturing a portable MP3 player, the Curvy. The Curvy comes in two forms: one with 32 GB of storage and one with 64 GB of storage. In doing production planning for the upcoming year, AB wants to determine how many of each type of Curvy to manufacture each month. Monthly demand for the Curvy is estimated to be 20,000 units for the 32 GB and 10,000 units for the 64 GB. AB has a limited number of manufacturing hours available to make these two products, with the hours being divided between fabrication, assembly, and shipping, as follows:
Department Monthly Labor Hours Available Hours/Unit 32 GB Curvy Hours/Unit 64 GB Curvy
Fabrication 12,000 1.5 1.75
Assembly 10,000 1.0 1.0
Shipping 6,000 1.0 1.0

Besides its own manufacturing facility, AB can contract out the manufacture to a subcontractor, who can supply up to 20,000 units per month total. This subcontractor will charge $115 for the 32 GB unit and $175 for the 64 GB unit, and it will ship directly to the distribution center. It costs AB $75 to make the 32GB unit and $125 to make the 64GB unit, if they build it themselves. AB plans on selling the 32 GB unit for $150 and the 64 GB unit for $250. Using its existing capacities, AB wants to determine how many of each model it should build itself and how many of each model it should order from the subcontractor in order to optimize profits. AB then wants to analyze the results to determine the best place to add additional capacity.

1. Create the spreadsheet model for this case and use Solver to ...

Solution provided by:
Education
  • B. Sc., University of Nigeria
  • M. Sc., London South Bank University
Recent Feedback
  • "Thank you."
  • "thank you Chidi Ngene.. if you have any APA references would be great"
  • "Thank you so much for your help, your explanations were easy to understand and apply!"
  • "are you able to highlight the equations used either on the xlsx or a word doc as to how each graph was formed- overall looks fine i just need help understanding this myself"
  • "Chidi Ngene, M. Sc. Was extremely helpful as without the help and guidance I would have failed, but with the help I passed. I still have a lot to learn and in need of the guidance to understand and learn more on the subject. I would recommend Chidi Ngene and BrainMass to anyone that are in need of help. Thank you!!"
Purchase this Solution


Free BrainMass Quizzes
Business Ethics Awareness Strategy

This quiz is designed to assess your current ability for determining the characteristics of ethical behavior. It is essential that leaders, managers, and employees are able to distinguish between positive and negative ethical behavior. The quicker you assess a person's ethical tendency, the awareness empowers you to develop a strategy on how to interact with them.

Organizational Behavior (OB)

The organizational behavior (OB) quiz will help you better understand organizational behavior through the lens of managers including workforce diversity.

Introduction to Finance

This quiz test introductory finance topics.

Understanding Management

This quiz will help you understand the dimensions of employee diversity as well as how to manage a culturally diverse workforce.

Change and Resistance within Organizations

This quiz intended to help students understand change and resistance in organizations