    1. The Hardrock Concrete Co has plants in three locations and is currently working on 3 major construction projects, each located at a different site. The shipping cost per truckload of concrete, daily plant capacities and daily project requirements are provided in the table above.

    (a) formulate an initial feasible solution to Hardrock's transportation problem using Northwest corner rule. Then evaluate each unused shipping route by computing all improvement indices. Is this solution optimal? Why?

    (b) Is there more than one optimal solution to this problem? Why?

    © BrainMass Inc. brainmass.com October 9, 2019, 9:34 pm ad1c9bdddf
    https://brainmass.com/business/management-information-systems/transportation-assignment-network-models-hardrock-concrete-co-190587

    Attachments

    Solution Preview

    See attached files.

    1. The hardrock concrete company has plants in three locations and currently working on 3 major construction projects, each located at a different site. The shipping cost per truckload of concrete, daily plant capacities, and daily plant requirements are provided in the table
    FROM/TO PROJECT A PROJECT B PROJECT C PLANT CAPACITIES
    PLANT 1 10 4 11 70
    PLANT 2 12 5 8 50
    PLANT 3 9 7 6 30
    PROJECT REQUIREMENTS 40 50 60 150
    1. Formulate an initial feasible solution to hardrock's transportation problem using the northwest corner rule. Then evaluate each unused shipping route by ...

    Solution Summary