    The table below shows the tasks required to assemble an aluminum storm door and the length of time needed to complete each task.

    This content was COPIED from BrainMass.com - View the original, and get the already-completed solution here!

    The table below shows the tasks required to assemble an aluminum storm door and the length of time needed to complete each task.

    Task Immediate
    Predecessor Task Time
    (sec)

    A None 32
    B A 43
    C A 12
    D A 23
    E B, C, D 15
    F E 25
    G None 20
    H F, G 5

    Suppose a cycle time is 90 seconds.

    (a) Compute the theoretical minimum number of workstations.

    (Round your answer up to the nearest whole number.)

    TM = workstations

    (b) Compute the outputs.

    (Round your answers to 2 decimal places, the tolerance is +/-0.05.)

    The maximum output?

    units per hour

    The minimum output?

    units per hour

    (c) Compute the efficiency.

    (Round your answer to 2 decimal places, the tolerance is +/-0.05.)

    Efficiency = %

    © BrainMass Inc. brainmass.com October 10, 2019, 5:12 am ad1c9bdddf
    https://brainmass.com/business/business-management/calculating-task-related-information-496497

    Solution Summary

    This solution shows how to compute the theoretical minimum number of workstations, the outputs, and the efficiency of the work done to assemble an aluminum storm door, and the amount of time required for each task.

    $2.19