    An analyst was developing a cost factor to estimate non-recurring tooling as a function of the recurring tooling cost. If the factor was constructed as:

    Nonrecurring Tooling Cost
    --------------------------------------
    Total (Recurring + Nonrecurring) Tooling Cost

    The mistake was:

    A) Recurring tooling would not be a good cost driver

    B) You can't have a factor with a cost-to-cost relationship

    C) The total cost should be in the numerator

    D) Nonrecurring costs were included in the denominator

    © BrainMass Inc. brainmass.com June 4, 2020, 3:00 am ad1c9bdddf
    https://brainmass.com/business/business-management/493640

    Solution Preview

    D) Nonrecurring costs were included in the denominator

    Nonrecurring costs are ...

    Solution Summary

    The mistake was:

    A) Recurring tooling would not be a good cost driver

    B) You can't have a factor with a cost-to-cost relationship

    C) The total cost should be in the numerator

    D) Nonrecurring costs were included in the denominator

    $2.19