    3. The number of cars arriving at Joe Kelly's oil change and tune-up place during the last 200 hours of operation is observed to be the following:

    # of Cars Frequency
    3 0
    4 10
    5 30
    6 70
    7 50
    8 40
    9 0

    a. Simulate the next 100 hours. What is the average number of cars going to be?

    b. If the average revenue per car is $ 22.50, want is the simulated average hourly revenue for Joe Kelly's garage?