Delta Electronic Services is an electrical-utility company serving parts of several states. It is considering replacing some of its equipment at generating substations and it trying to decide whether it should replace an older, existing PCB transformer. (PCB is a toxic chemical known formally as polychlorinated biphenyl) Although the PCB generator meets all current regulations, if an incident such as a fire were to occur, and PCB contamination cause harm either to neighboring businesses or farms or the environment, the company would be liable for damages. Recent court cases have shown that simply meeting regulations does not relieve a utility of liability if an incident causes harm to others. In addition, courts have been awarding very large damages to individuals and business harmed by incidents involving hazardous materials.

If delta replaces the PCB transformer, no PCB incidents will occur, and the only cost will be the cost of the new transformer, estimated to be $85,000. Alternatively if the company elects to keep the existing PCB transformers in operations, then, according to their consultants, there is a 50/50 change that there will be a high likelihood of an incident or a low likelihood of an incident. For the case of a high likelihood of an incident, there is also a 0.004 probability that a fire wall occur sometimes during the remaining life of the transformer, and a 0.996 probability that no fire will occur. If a fire occurs, there is a 20 percent change that is will be severe and the utility will incur very high cost, whereas there is an80 percent change that it will be minor and the utility will incur a low cost. The high- and low-cost amounts, including both cleanup and damages, are estimated to be $100 million and $10 million, respectively, based on results from other incidents in the industry. For the case of a low likelihood of an incident, there is a 0.001 probability of a fire during the remaining life of the transformer and a 0.999 probabilities exist for the severe and minor outcomes as in the previous case. In both cases, there will be no cost if no fire occurs.

a. Should Delta replace its old transformers?

b. What is the expected cost per transformer, under the optimal replacement strategy?

© BrainMass Inc. brainmass.com October 24, 2018, 9:52 pm ad1c9bdddf
https://brainmass.com/economics/electrical-utilities/140550

Solution Preview

Please find the decision tree attached. I have used Precision Tree to draw the tree, but you can ...

Solution Summary

The solution answers the question below in great detail.

$2.19
See Also This Related BrainMass Solution

Linear Programming, Queueing Analysis, Simulations, Decision Analysis and Forecasting

A) What are 2 possible ways to improve the service rate of a waiting line operation?

B) Briefly describe how simulation could be used to assist decision makers in regards to new product development?

C) Give an example of how Decision analysis could be used to determine an optimal strategy? Briefly describe several decision alternatives a decision maker would be faced with and possible uncertain future events to consider.

D) What is the difference between quantitative forecasting methods and qualitative forecasting methods?

E) Under what circumstances would it be more appropriate to use quantitative rather than qualitative forecasting methods?

F) Give an example of a situation when using quantitative forecasting would be appropriate?