    Q2 Assume the ABC Inc. estimated a short-run average variable cost function for its product as: AVC = a + bQ + cQ2, using time-series data for 15 years where Q = number of units of output. The output obtained from the computer is below:

    DEPENDENT VARIABLE: AVC OBSERVATIONS: 15 R-SQUARE 0.4135 F-RATIO 4.230 P-VALUE ON F 0.0407

    VARIABLE PARAMETER
    ESTIMATE STANDARD
    ERROR T-RATIO P-VALUE
    INTERCEPT 30.4202 6.4659 4.70 0.0005
    Q -0.0799 0.0308 -2.60 0.0232

    a. Are the estimates of a, b, and c have correct signs? Are they statistically significant at 5% level of significance? (use t-ratios from t-table in your textbook)
    b. At what level of output do you estimate the AVC reaches its minimum value?
    c. What is the estimated Marginal curve?
    d. What is the estimated Marginal Cost when output is 700 units?
    e. What is the estimated AVC curve?
    f. What is the estimated AVC when output is 700 units?

    2

    © BrainMass Inc. brainmass.com October 10, 2019, 8:22 am ad1c9bdddf
    https://brainmass.com/economics/elasticity/average-variable-cost-marginal-cost-622335

    Attachments

    Solution Preview

    Please see the attachment.

    Q2 Assume the ABC Inc. estimated a short-run average variable cost function for its product as: AVC = a + bQ + cQ2, using time-series data for 15 years where Q = number of units of output. The output obtained from the computer is below:

    DEPENDENT VARIABLE: AVC OBSERVATIONS: 15 R-SQUARE 0.4135 F-RATIO 4.230 P-VALUE ON F 0.0407

    VARIABLE PARAMETER
    ESTIMATE STANDARD
    ERROR T-RATIO P-VALUE
    INTERCEPT 30.4202 6.4659 4.70 0.0005
    Q -0.0799 0.0308 -2.60 0.0232

    a. Are the estimates of a, b, and c have correct signs? Are ...