    1. A manufacturing plant is capable of producing 10 tons of product per day when run three shifts with no breakdowns and plenty of raw materials. Over the past week, the plant has produced an average of 7.3 tons per day because the third shift has devoted much of their time to preventive maintenance. What is the utilization of the plant?
    a. 10 tons/day
    b. 7.3 tons/day
    c. 137%
    d. 73%

    Answer is:

    © BrainMass Inc. brainmass.com June 4, 2020, 12:16 am ad1c9bdddf
    https://brainmass.com/business/business-management/utilization-capacity-planning-328671

    Attachments

    Solution Preview

    Utilization is calculated as a percentage where as capacity is an actual number per unit.

    1. A manufacturing plant is capable of producing 10 tons of product per day when run three shifts with no breakdowns and plenty of raw materials. Over the past week, the plant has produced an average of 7.3 tons per day because the third shift has devoted much of their time to preventive maintenance. What is the utilization of the plant?
    a. 10 tons/day
    b. 7.3 tons/day
    c. 137%
    d. 73%
    Answer is: d (73%)
    Utilization of the plant is how much it was used. 7.3 ...