    Each R requires 2 components S and 1 part T. The lead time for assembly at R is 3 days. The lead time for the manufacture of S is 5 days. The lead time for the manufacture of T is 10 days.

    The cumulative lead time for R is how many days?

    A.6
    B.9
    C.13
    D.17