Explore BrainMass

Explore BrainMass

    Master Production Scheduling using L4L Rule

    This content was COPIED from BrainMass.com - View the original, and get the already-completed solution here!

    The master scheduling team at a plant producing steel chain is considering a lot-for-lot policy instead of batching into larger lots. The following is their partially completed analysis for 3 levels of chain making (final chain making, fed by fabrication of cut steel pieces, fed by purchased steel rods).

    (See attachment).

    © BrainMass Inc. brainmass.com June 3, 2020, 6:47 pm ad1c9bdddf
    https://brainmass.com/business/business-management/master-production-scheduling-using-l4l-rule-75407

    Attachments

    Solution Preview

    In L4L rule, the lot size ordered covers the gross requirements (demand) of a single week. The goal is to minimize inventory levels. Using this rule, the completed analysis is done in ...

    Solution Summary

    This posting contains solution to a problem of Master Production Scheduling using L4L Rule.

    $2.19