MPS problem

Assume you are employed by a company that makes a type of simple chair. MRP is to be the method of inventory planning for the chair.

a. Draw a bill of materials structure for the chair. Briefly explain or sketch the type of chair.

b. Develop an 8 to 10 week MPS for the chair

c. Develop MRPs for 3 or 4 of the chair?s components, with the following restrictions:

(1) Include Level 1 and level 2 components (e.g. a chair arm might be level 1 and the raw material for making it level 2)

(2) Make your own assumptions about lead times, order quantity

Solution Summary

This posting contains a problem related to MRP. It includes drawing a BOM, preparing a Master Production Schedule and MRP for a chair.