Max 8X + 7Y s.t. 15X + 4Y < 75 10X + 7Y < 70 X + Y < 8 X, Y > 0 a.Use a graph to show each constraint and the feasible region. b.Identify the optimal solution point on your graph.What are the values of X and Y at the optimal solution? c.What is the optim ...continues
The post office uses a multiple channel queue, where customers wait in a single line for the first available window. If the average service time is 1 minute and the arrival rate is 7 customers every five minutes, find, when two service windows are open, (Use Management Scientist, Make sure that l and m are in the same units). ...continues
Mathematics, topic: Simulation from book Quantitative Methods for master program at Strayer University; see attachment for scans.
I need help for problem number 6. Please look at the attachment.
Simulation of a system, and time series
Mathematics: Simulation of a system, and time series; from book Quantitative Methods for master program at Strayer University. See attached. The number of cars arriving at Joe Kelly’s oil change and tune-up place during the last 200 hours of operation is observed to be the following: # of Cars Frequency ...continues
problem in the attached. The New York City Development Corporation has just purchased a small hotel for conversion to condominium apartments. The building, in a popular area of New York, will be highly marketable, and each condominium sale is expected to yield a good profit. The conversion process, however, includes se ...continues
Cumulative Probability: Random Numbers
How would I simulate the drying time for 5 processes to .53, .95, .97, .36 and .07? Minutes Frequency 3 .22 4 .36 5 .28 6 .10 7 .04
Number of cars arriving for oil chg and tune up in last 200 hours of operation and two digit random numbers are developed: Number of Cars Arriving Frequency Random # of Ranges 3 or less 0 4 10 00-04 5 30 ...continues
Linear programming and graphically ...
Irwin produces two types of cotton cloth-demin corduroy. Corduroy is a heavy grade of cotton cloth and requires 7.5 pounds of raw cotton per yard, whereas demin requires 5 pounds of raw cotton per yard. A yard of corduroy requires 3.2 hours of processing timel a yard of denim requires 3 hours. Although the demand for denim is ...continues
Chemco produces a chemical mixture for a specific customer in 1000 pound batches. The mixture contains three ingrediants zinc, mercury, and potassium. The mixture must conform to formula specifications that are supplied by the customer. The company wants to know the amount of each ingredient it needs to put in the mixture tha ...continues