Difficulty in setting up the constraints for the problem

The famous Y.S. Chang Restaurant is open 24 hours a day.  Waiters and busboys report for duty at 3am, 7am, 11am, 3pm, 7pm or 11pm and each works an 8-hour shift.  The following table shows the minimum number of workers needed during the six periods into which the day is divided.  The scheduling problem is to determine how many waiters and busboys should report for work at the start of each time period to minimize the total staff required for one day's operation.

Period     Time           # of waiters/busboys required
1          3am-7am        3
2          7am-11am       12
3          11am-3pm       16
4          3pm-7pm        9
5          7pm-11pm       11
6          11pm-3am       4


Solution Summary

This shows how to schedule staff to minimize total number required.

Solution
What is this?
By OTA - Overall OTA Rating
Sheng Huang, MSc - 4.6/5
Purchase Cost Now
$2.19 CAD (was ~$11.97)
Included in Download
  • Plain text response
  • Attached file(s):
    • constraints.doc
$2.19 Instant Download
Add to Cart
Why you can trust BrainMass.com
  • Your Information is Secure
  • Best Online Academic Help Service
  • Students find real academic Success
Related Solutions
  • Minimize cost - I have a volume problem to minimize cost.
  • Linear Algebra : Symmetric Polynomials and Inner products - Let be the real vector space of "symmetric" polynomials of degree at most 4, with inner product a. find a basis for V and determine dim V. b. viewing V as a subspace of R) with the same in ...
  • Probability - A fire station is to be located along a road of length A, A < ∞. If fires will occur at points uniformly chosen on (0, A), where should the station be located so as to minimize the expected dist ...
  • Minimize z = 8x + 3y subject to ... (See the attached question file) - Minimize z = 8x + 3y subject to ... (See the attached question file)
  • Project Scheduling - 2. Bridge city developers has the following activity list. draw a project network that can be used to assist in the scheduling of the project activities: activity a b ...
Browse