Civil and Environmental Engineering Homework Solutions
Problem
#22016

TEXT BOOK MANAGEMENT SCIENCE 7 EDITION BY BERNARD TAYLOR

Plaese I like OTA #102862 help me to solve this problem.
The bluegrass destillery produces custom-blended whiskey. A particular blend consists of rye and bourbon whiskey. The company has received an order for a minimum of 400 gallons of the custom blend. The customer specified that the order must contain at least 40% rye and not more than 250 gallons of bourbom. The customer also specified that the blend should be mixed in the ratio of two parts of bourbon. The destillery can produce 500 gallons per week regardless of the blend. The production manager wants to complete the order in one week. The blend is sold for $5 per gallon.
The destillery company's cost per gallon is $2 for rye and $1 for bourbon. The company wants to determine the blend mix that will meet customer requirements and maximize profits.
Formulate a linear programming model for this problem.

Solution
What is this?
By OTA - Overall OTA Rating
Purchase Cost Now
$2.19 CAD (was ~$11.97)
Included in Download
  • Plain text response
  • Attached file(s):
    • Posting 22016.doc
$2.19 Instant Download
Add to Cart
Why you can trust BrainMass.com
  • Your Information is Secure
  • Best Online Academic Help Service
  • Students find real academic Success
Related Solutions
Browse